Home
Contests
Equipment
Logsearch
QSL info
Links
|
|
SteppIR installation at G3LAS
Back to Equipment
On 16th August 2008, Michael G7VJR, & myself, Mark G4AXX, helped John G3LAS install a 3-element SteppIR yagi.
Click on a thumbnail below to see a larger picture
 |
The manuals |
 |
Getting the elements out of storage |
 |
Setting up in the garden |
 |
The boom with the EHUs |
 |
Michael & John check the assembly |
 |
The tower is lowered |
 |
Mark & Rachel help Michael fix the boom plate |
 |
Tightening up the driven element U-bends |
 |
Tidying up the cables |
 |
Partial lift of the tower |
 |
Rotating the antennas 180 deg to fit the last element |
 |
Last tightening of the rubber boots that hold it all together |
 |
Mark raises the tower |
 |
John makes it secure |
 |
Fluid Motion 40-10m SteppIR ready for some QSOs |
|
|